Extension to primary school building, Aeschi bei Spiez

2019
Extension to primary school building
Extension to primary school building

The primary school building in the Lower Simmental of the Canton of Bern has reached the limits of its capacity. Wood from the community's own forests could be used for the extension.

The project

The primary school building in Aeschi bei Spiez was extended by a new three-story building in timber construction. The new part of the schoolhouse contains classrooms, group rooms, workrooms and space for a kindergarten. The three floors above ground were built entirely in wood. The base and basement levels were concreted. During the construction of the building, thought was already given to the future: the interior walls are non-load-bearing and thus allow maximum flexibility of use. In addition, all components are dimensioned in such a way that the school building can be extended by one floor at a later date. For this purpose, the forces are largely transferred via the wooden columns that are clamped at the bottom and run through the entire height of the building.

The construction method

The extension building cleverly combines the solid wood and frame construction methods: All load-bearing walls and the floor slabs are made of glulam in solid wood construction. The interior walls are non-load-bearing frame structures. Largely knot-free fir boards were used for the facades.

The challenge

Due to the use of the community's own timber, the planning took place very early: Already at the time of cutting the trees, Timbatec had to provide a rough work planning. This ensured that the correct cross-sections could be obtained from the trees in the municipal forest. Another exciting aspect of this project was the fire protection solutions: The vertical escape routes are designed as encapsulated wooden structures

Interior view of the schoolroomInterior view of the schoolroom
Schoolroom with view to the mountainsSchoolroom with view to the mountains
Bearing of the beams on the supportsBearing of the beams on the supports
Elastic bound dry fillElastic bound dry fill
Project information
  • - Glued laminated timber 630 m3
  • - Three-layer boards 900 m2
  • - Gypsum fiberboards 1'050 m2
Construction costs
  • - BKP 1-9: CHF 8 million
  • - BKP 2: CHF 6.792 million
  • - BKP 214: CHF 1.396 million
Design stages
  • - SIA Phases 31 - 52
Design services
  • - Structural Engineering and Analysis
  • - Construction
Additional Expertise
  • - Fire protection QSS2
  • - Technical Construction Management and Site Inspections
Client

Einwohnergemeinde Aeschi3703 Aeschi b. Spiez

Architecture

JAGGI FREI BRÜGGER3714 Frutigen

Civil engineering

Ramu Ingenieure AG3714 Frutigen

Building physics

Weber Energie und Bauphysik AG3011 Bern

Timber construction

ARGE Däpp Holzbau GmbH

Timber construction

ARGE Cotting GmbH

Privacy notice
This website uses external components that can be used to collect data about your behavior. Read more about this in our privacy policy.