The project
The logistics center consists of two sections: an office wing with two upper floors and a single-story warehouse. The loading area for the high-bay warehouse is located beneath the office wing and to the side of the warehouse. The basement houses a large parking garage. The project was planned and completed in a very short time.
The construction method
The high-bay warehouse was constructed using timber framing starting from the ground floor. Glulam beams span the nearly 28-meter-wide structure. The structure is braced using steel tie rods. Thanks to the timber construction, the building was erected in a very short time. The office wing stands on a concrete base. The floor slab, flat roof, and walls were constructed using prefabricated wood elements.
The challenge
The building is located directly next to the tracks and within the vicinity of a high-voltage power line. In areas where the building does not maintain the required distance from the high-voltage power line, the timber-frame structures had to meet stringent fire safety requirements (REI90-RF1).
Construction Data
- Building dimensions: 37 x 66 x 10 m
- Total floor area: 3'270 m2
Construction costs
- BKP 214: CHF 1.7 million
Services of Timbatec
- SIA Phase 31 Preliminary design
- SIA Phase 32 Construction design
- SIA Phase 41 Tendering and comparison of offers
- SIA Phase 51 Construction design
- SIA Phase 52 Construction
- SIA Phase 53 Commissioning
- Structural analysis and design
Client
Hug Baustoffe AG
8606 Nänikon
Architect
Inova Partner AG
8623 Wetzikon
Timber construction
Gebrüder Steiner Holzbau AG
8606 Nänikon
Timber construction
STRABAG AG, Lindau
8315 Lindau/ZH
Civil Engineer
Aschwanden & Partner
8630 Rüti ZH
Construction Management
Hirzel Generalunternehmung AG
8623 Wetzikon