Settlement Oberfeld, Ostermundigen bei Bern

2014

On the edge of the Ostermundigenberg, the car-free wooden housing estate "Oberfeld Ostermundigen" was built with around 110 apartments. Close to nature and yet quickly in the center, the settlement combines the advantages of the urban lifestyle with rural idyll.

Facts and images
Construction Data
Involved
Articles
Fassade Ost
Fassade Ost
Playground
Playground
House C terrace with view
House C terrace with view
Cut with continuous wind paper on the outside
Cut with continuous wind paper on the outside

The project
As a pioneer building of the 2000 Watt society, the largest wooden housing estate in the canton of Bern was realized in Minergie P construction with around 110 apartments. The energy concept provides for energy to be collected and stored in the ground in summer and used in winter. An absolute novelty. Residents also voluntarily give up their cars; instead, 400 bicycle parking spaces are available. Particular attention was paid to the building physics solutions with good thermal and moisture protection. This ensured that the buildings are comfortable even with minimal heating energy.

The construction method
The three buildings were erected as timber structures from the concreted ceiling above ground level. The load-bearing exterior walls and the skeleton structure inside the building were used for load transfer. This allowed the interior walls to be constructed as non-load-bearing plaster walls and the rooms to be freely partitioned. A wood-concrete composite floor with a visible board stack and superimposed concrete was used as the floor slab. In order to meet the aesthetic requirements for flush floor joists, these were designed as steel girders. These are connected to the staircase cores by means of inserts. Naturally, the girders were clad in accordance with fire protection requirements. The structural wood and moisture protection could be ensured with the large arcades.

Construction Data

- 685 m3 Glulam GL24h

- 1285 m3 Structural timber C24

- 17.6 m3 Kerto Q

- 4595 m2 3-layer boards

- 6585 m2 Gypsum fiberboards


Construction costs

- BKP 1-9: 48.7 Mio.

- BKP 2: 36.8 Mio.

- BKP 214: 8.4 Mio.


Services of Timbatec

- SIA phase 21 structural review

- SIA Phase 31 Preliminary design

- SIA Phase 32 Construction project

- SIA Phase 41 Tendering and comparison of offers

- SIA Phase 51 Implementation project

- SIA Phase 52 Execution

- Statics and construction

- Fire protection planning

- Fire protection Quality assurance QSS2

- Cost estimation

Civil engineer
Tschopp Ingenieure GmbH
3006 Bern


Architect ARGE PSO (lead)
Halle 58 Architekten
3005 Bern


ArchitectARGE PSO
Planwerkstatt Architekten
3013 Bern


Architect ARGE PSO
Eberhart Bauleitungen AG
3014 Bern


Timber ConstructionEngineers
Timbatec Holzbauingenieure Schweiz AG, Thun
3600 Thun


Timber construction
Beer Holzbau AG
3072 Ostermundigen